NEW TECHNOLOGIES IN AUTOMATION CONTROL SYSTEMS!
GIPKON TECHNOLOGY; Oriented in many sectors, AUTOMATION CONTROL SYSTEMS, YOU PROVIDE NEW TECHNOLOGIES TO DISTRIBUTED CUSTOMERS ...
Read more

Dıscovery and Rısk Analysıs

Anasayfa » Servıces » Dıscovery and Rısk Analysıs
Discovery

Our teams first make the necessary discoveries in the area where the desired systems will be installed. Then the obtained data is transferred to the computer environment and converted into the layout plan and P&id drawings. With the data obtained, detailed drawings and final settlement plan, pipeline routes, cable channel routes, electric panel layout plans will be completed, and after this data is delivered to you, the discovery phase of the project is completed. If inter-system communication is to be established, studies related to this will be done during 1st and 2nd discovery.

Risk Analysis

Occupational safety procedures and risk analysis procedures are usually carried out after installation and therefore systems installed are subject to change. GIPKON Technology systems are subjected to simulation tests in digital environments prior to installation, making sure that there is no software security vulnerability on this site. In addition, by designing systems suitable for work safety with the data obtained during the explorations, it prevents the security revisions of systems after installation.